Bachmann Spectrum 44 tonner prior to "the surgery". This is a dual motor.
Checking the Low Gap trestle alignment
Roughed out scenery and track for the crossroads
A Cedar Branch and Western freight travels through the mountains enroute to Rabbit Hill.
#103 heads east as it crosses Gaskins Creek.
Steaming slowly at Hartford, WI
Cars sit in the Yard at Willoughby. Reefer is re-detailed Athearn, Box is Red Caboose.
Work train sits on a siding at the Mountain King MIne on the Willoughby Line.
Stock cars on siding in Groveland on the Willoughby Line. Cars are 2PK, Mill is Campbell's built by Mike Schwab.
Gondolas await their next assignment at Groveland on the Willoughby Line. Gons are Rio Grande Models kits, flat is scratchbuilt.
log bunks await switching at Groveland on the Willoughby Line. Bunks and gons are Rio Grande models kits, flat is scratch built.
The Yard crew at Groveland switches out this caboose in preparation for its' next assignment on the Willoughby Line. Caboose is WSM brass, Shay...
A log train prepares to leave Groveland for the woods on the Willoughby Line. Log bunks are Rio Grande Models kits.
Cars wait at Groveland to be unloaded the Wiloughby Line. Stock cars are P2k, Boxes are Red Caboose.
A 4-6-0 Waits in the hole at Mather on the Willoughby Line. Flat is scratchbuilt, Side dump gons are Rio Grande Models, Loco is Spectrum
Stone Arched Bridge that was part of the Valley Line - Shenandoah Valley Line development between 1862-1882. This Bridge never saw use as the Line...