Moose's Workbench Activities 2

Moose2013 Mar 1, 2022

  1. Moose2013

    Moose2013 TrainBoard Member

    747
    3,490
    47
    The Moose construction crew has been working on the logging trestle:
    :)

    1_TrestleFitCheck_20220309_140519.jpg
     
  2. badlandnp

    badlandnp TrainBoard Member

    4,587
    16,155
    90
    Ooooo!!! I like tall trestles!!! Just don't want to build one..........
     
    Hardcoaler, hawkdriver and Moose2013 like this.
  3. BNSF FAN

    BNSF FAN TrainBoard Supporter

    10,049
    30,184
    153
    That is a cool looking trestle Mr. Moose (y)(y)(y)
     
    Hardcoaler and Moose2013 like this.
  4. freddy_fo

    freddy_fo TrainBoard Member

    1,106
    4,390
    47

    Moose hanging out so close to the edge of the trestle makes me nervous:ROFLMAO:
     
    Moose2013, BNSF FAN and badlandnp like this.
  5. Moose2013

    Moose2013 TrainBoard Member

    747
    3,490
    47
    Moose feel like Walt Disney as the Mooseland (TM) construction crew builds some background hills north of Oban Yard. :)

    1_ObanHills_20220312_064431.jpg 2_ObanHills_20220312_064503.jpg

    The plaster and sealer are kinda workin' against Moose as they warped a wee bit as they dried. Oh well, nothing for it... :(
     
    eposte12, hawkdriver, in2tech and 8 others like this.
  6. Moose2013

    Moose2013 TrainBoard Member

    747
    3,490
    47
    The Mooseland (TM) construction crew has finished painting Oban Hills :) ... Now to wait for the paint to dry... :cautious:

    1_ObanHills_20220313_141011.jpg 2_ObanHills_20220313_141046.jpg
     
  7. JMaurer1

    JMaurer1 TrainBoard Member

    2,320
    1,765
    53
    Mooseland? I thought it was Wally World!
     
    MetraMan01 likes this.
  8. Shortround

    Shortround Permanently dispatched

    4,410
    5,283
    93
    Things get done at Mooseland.
     
  9. Moose2013

    Moose2013 TrainBoard Member

    747
    3,490
    47
    Well, Moose is bummed... :(

    Moose started cleaning up and painting all the wee bits of a really nice Period Miniatures station depot kit. Moose need to take measurements for the footprint of a scratch built foundation and platforms for the station, when Moose realize that the area between the two station tracks is too narrow for this station depot kit. Moose has two other station kits that are also too wide for the available space. Arrrg! :mad:

    Off to figure out how to scratch and bash a narrower station build... :cautious:

    EDIT: On closer examination of the kit's wood bits, Moose belatedly realizes that the kit manufacturer printed the trim locations incorrectly on one of the wood sheets, resulting in the "board" scribe marks on the wrong side of the sheet ... Moose i'll have to scratch build the correct side while altering the overall width of the building... Arrrg!
    :mad:
     
    Last edited: Mar 16, 2022
    badlandnp, BNSF FAN, in2tech and 2 others like this.
  10. Champsummers

    Champsummers TrainBoard Member

    22
    21
    13
    Absolutely beautiful. The metal roof looks great!
     
  11. Moose2013

    Moose2013 TrainBoard Member

    747
    3,490
    47
    Thank you very much good sir! :)
     
  12. OleSmokey

    OleSmokey TrainBoard Member

    933
    2,072
    43
    Nicely done in mooseland
     
    Moose2013 likes this.
  13. in2tech

    in2tech TrainBoard Member

    2,703
    7,639
    78
    Da Moose will figure it out. He always does :)
     
    MetraMan01, Shortround and Moose2013 like this.
  14. JMaurer1

    JMaurer1 TrainBoard Member

    2,320
    1,765
    53
    That's the problem when one measures in hooves instead of feet...
     
    Moose2013, badlandnp and mtntrainman like this.
  15. mtntrainman

    mtntrainman TrainBoard Supporter

    10,041
    11,192
    149
    I was thinking that it might be easier to move the distance between the 2 tracks further apart then rebuilding a building, But thats just me...:whistle:
     
    BNSF FAN, JMaurer1 and OleSmokey like this.
  16. Moose2013

    Moose2013 TrainBoard Member

    747
    3,490
    47
    Having made some startling discoveries about the Oban Station (Period Miniatures station depot kit) that make it not fit for use, Moose commissioned Moose Model Works (TM) to develop a replacement.
    :)
    And now, the Mooseland (TM) construction crew has its hooves full with the start of work on Oban Station ... ... ... Again. Yeah!
    o_O
    Here's most of the kit's parts:
    1_ObanStationBits_20220322_100326.jpg

    Note: Not appearing in this picture are various supporty bits, roof panels, and the all elusive windows and doors...
     
    RGW, OleSmokey, badlandnp and 3 others like this.
  17. JMaurer1

    JMaurer1 TrainBoard Member

    2,320
    1,765
    53
    Some of those doors don't look wide enough to fit a moose. Can't wait to see the finished product and hear more of the creation of MMW (tm).
     
    badlandnp, OleSmokey and Moose2013 like this.
  18. Moose2013

    Moose2013 TrainBoard Member

    747
    3,490
    47
    The Mooseland (TM) construction crew has finished the exterior construction of Oban Station. Yea!
    :)

    Now to order the windows and barely-fits-a-pair-of-moose-antlers-if-moosehead-cocked-at-an-angle doors...
    o_O

    1_StationSEView_20220324_105249.jpg 2_StationNEView_20220324_105410.jpg 3_StationNWView_20220324_105435.jpg 4_StationSWView_20220324_105146.jpg
     
    RGW, Bourkinafasso, MK and 8 others like this.
  19. BNSF FAN

    BNSF FAN TrainBoard Supporter

    10,049
    30,184
    153
    That is some excellent looking work there Sir Moose! (y)(y)(y)
     
    Last edited: Mar 24, 2022
    Moose2013 and tonkphilip like this.
  20. Moose2013

    Moose2013 TrainBoard Member

    747
    3,490
    47
    @BNSF FAN

    Thank you very much, good sir! Very much appreciated! :)
     
    tonkphilip and BNSF FAN like this.

Share This Page