LordPyro

The lower track is the new line going from the previously pictured inlaid switch, and the short-line track. The upper track is the steep grade (3%) going from the bottom track to the top, the long section will eventually be a bridge.

The lower track is the new line going from the previously pictured inlaid switch, and the short-line track. The upper track is the steep grade (3%) going from the bottom track to the top, the long section will eventually be a bridge.
LordPyro, Sep 4, 2010
    There are no comments to display.
  • Album:
    S-Scale
    Uploaded By:
    LordPyro
    Date:
    Sep 4, 2010
    View Count:
    298
    Comment Count:
    0