Log in or Sign up
TrainBoard.com - The Internet's Original
TrainBoard
RailImages
>
Albums
>
S-Scale
Our S-Scale railroad
Sort By:
Date
Sort By...
Date
Comments
Rating
Likes
Views
Filters
Type Filters
Any
Images
Videos
Embeds
LordPyro
S-Scale
0 x
New York Central 4-8-2 (Samhongsa Brass Korean Import)
0
260
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Gas Electrics (Samhongsa Brass Import)
0
198
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Kentucky Road 2-8-0 (Samhongsa Brass Import). Currently under repairs.
0
239
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Erie Lackawana GP 35 (American Models - Plastic)
0
248
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Kentucky Road FA-2, FB-2 & C&O FP7 (American Models)
0
335
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
C&O GE U 25 B (American Models - Plastic)
0
296
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
GE 25 ton (AHM 1975 HO model converted to S)
0
233
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Southern FP7s painted by my dad (American Models), and SW-7 (S-Helper Service).
0
235
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
3 worn out engines, a 2-6-0 (Rex Kit), 2-8-0 (Brass kit), and a RS-2 (Alco Models Brass Import).
0
279
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Kentucky Road, and Erie Lackawana GP-9's (American Models - Plastic)
0
210
1
0
04 Sep 2010
LordPyro
S-Scale
0 x
Erie Lackawana F-3 A/B set (S-Helper Service - Plastic)
0
207
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Kentucky Road FP7s (American Models - Plastic)
0
200
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
PRR K-4 (American Models Cast Metal and Plastic)
0
204
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Finished scratch built curving switch (Code 100 rail, caboose hobbies ground throw)
0
222
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Finished scratch built curving switch (Code 100 rail, caboose hobbies ground throw)
0
350
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Finished scratch built curving switch (Code 100 rail, caboose hobbies ground throw)
0
203
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Aeriel shot down the wall of the train room.
0
266
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Aeriel shot diagonally over the train room.
0
270
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Aerial shot of the train room looking down the length of the room.
0
235
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Here is the double track with crossover. Also on the left is the steep grade finally coming into the double track and the to the right is a track leading to the reversing loop or helix.
0
423
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
The steep grade (3%) finally makes it to the top and starts to level off.
0
260
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Another shot of the yard from the other angle.
0
211
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Bridge on the track leading to the new short-line, the dam in the back will be for a future mill in the slot on the right. The siding with the box car is for the mill.
0
279
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
The lower track is the new line going from the previously pictured inlaid switch, and the short-line track. The upper track is the steep grade (3%) going from the bottom track to the top, the long section will eventually be a bridge.
0
296
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Shot of the short-line switches and bridges over the river.
0
230
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Recent shot of the new short-line, almost have all the track laid and are getting ready to start work on the turntable (very lower left corner).
0
275
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Shot of the yard track.
2
278
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
C&O engines waiting on side track for a train. The building is one of the few we were able to salvage from the old layout.
0
274
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Streamlined Pennsy 4-6-2 overtaking a heavy freight. Also note the passenger train on the third track waiting to leave the station and another train on the forth track.
0
281
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Streamlined Pennsy 4-6-2 overtaking a heavy freight.
0
233
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Finished switch inlay, we had to remove a section of ballasted track to put the switch in for the new short-line.
0
220
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Laying out the only scratch built switch on the railroad, and a curving one at that! My dad had scratch built many of the switches on his original railroad.
0
242
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Test fitting track over river, note the closer ties for the bridge section.
0
195
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Early progress shot of our new short-line (used to be a dog-bone n-scale layout).
0
248
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Getting ready to lay plaster for the hillside.
0
225
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Shot of the triple track reversing loop behind the area being plastered. Note the tunnel to the far right, this is leading to the helix going down below the reversing loop.
0
237
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Getting ready to lay plaster for the hillside.
0
217
0
0
04 Sep 2010
LordPyro
S-Scale
0 x
Getting ready to lay plaster for the hillside.
0
176
0
0
04 Sep 2010
LordPyro
,
Sep 4, 2010
Show Ignored Content
Album Comments
There are no comments to display.
Show Ignored Content
Log in with Facebook
Log in with Twitter
Log in with Google
Your name or email address:
Do you already have an account?
No, create an account now.
Yes, my password is:
Forgot your password?
Stay logged in
TrainBoard.com - The Internet's Original
TrainBoard
RailImages
>
Albums
>
TrainBoard
TrainBoard
Quick Links
Recent Posts
RailImages
RailImages
Quick Links
Search Media
New Media
Resources
Resources
Quick Links
Most Active Authors
Latest Reviews
Support TrainBoard
eBay
Menu