dave n

CSX_Mtn_Sub_061013_113_adj

A loaded coal train grinds upgrade through Graveyard Curve on the CSX Mountain Sub. The grade here is 2.84% uphill. 10/13/06

CSX_Mtn_Sub_061013_113_adj
dave n, Oct 17, 2006
Kurt Moose likes this.