CSX_Mtn_Sub_061013_113_adj
A loaded coal train grinds upgrade through Graveyard Curve on the CSX Mountain Sub. The grade here is 2.84% uphill. 10/13/06
-
There are no comments to display.
A loaded coal train grinds upgrade through Graveyard Curve on the CSX Mountain Sub. The grade here is 2.84% uphill. 10/13/06