BAZ BoyZ 45 degree module progress
Rocks are chosen and located, ready for plaster cloth (rock taken off first, then plaster, then rocks back in place). Bridges cut in across the river and creek. "Backside" has plate bridge from N-scale Micro Engineering #143, perfect width for wider ties used on bridges. Front side has Walthers Cornerstone Plate Girder with new narrower deck and cross braces for Z spacing. Creek just using 40' flat car with wide tie decking.
-
There are no comments to display.
-
- Album:
- 45 and 30 degree modules
- Uploaded By:
- SJ Z-man
- Date:
- May 24, 2008
- View Count:
- 890
- Comment Count:
- 0