Work areas in your trainroom

ppuinn Mar 25, 2008

  1. Fotheringill

    Fotheringill TrainBoard Member

    5,982
    0
    74
    I am not going to post a picture because I would need several pictures.

    The neat guys scare the heck out of me when I think about what I have done. My actual work area is a complete jumble of everything on it. A 3 x 5 workbench has been reduced to available work area of the size of a cardboard shirtback, which is what I use for a mat.

    I lookeed at the benchwork on my expansion that has not yet been covered with anything other than MDF. I am doing the layout in sections of about 18" x 4' so I can easily lay out the track, drop wires and solder and then scenic the same. It goes slowly, but at least I am not underneath most of the time.

    The actual work area has expanded to the entire rest of the benchwork that has not been ready for laying track, etc. Soldering station, scenic materials, foam cutter, foam board, cork, track, paints, temporary wiring, temproary switching, etc. As I get to the next section, theings get moved along to remaining open space. I shudder when I think of what will happen when I am about 35% done and run out of room for all of the stuff.
     
  2. LALLEY

    LALLEY TrainBoard Supporter

    180
    37
    13
    Here's my little work bench... clutter and mess is the standard array :tb-wink:
     

    Attached Files:

Share This Page