West Local

jhn_plsn Mar 2, 2023

  1. jhn_plsn

    jhn_plsn TrainBoard Supporter

    2,424
    1,474
    54
    A greatly abbreviated depiction of work west of SP's West Colton in N scale. I need to keep the depth at around 12" to facilitate a longer mainline run opposite the isle.
    Goals;
    Space limits.
    Long enough siding for many cars.
    2 Loco Escape.
    Run around.
    A tail track for opposing point tracks without using industry tracks.
    Busy, but not overly complex.
    Industries;
    A1-Grit
    Peterman Lumber
    California Steel Interchange
    Ergon Asphalt & Emulsions or Master Metals

    I'm liking this iteration. I feel good enough to move ahead even if things change a bit.
    2023-03-01 (1).png
     
    BNSF FAN, BigJake and BoxcabE50 like this.

Share This Page