TBM arrives for Rio Line 4

Mr. RSS Mar 22, 2013

  1. Mr. RSS

    Mr. RSS Administrator

    7,119
    1
    83
    BRAZIL: Work is now underway in Rio de Janeiro to assemble a 2 000 tonne Herrenknecht tunnel boring machine that is to be used in the construction of metro Line 4 from Ipanema to Barra da Tijuca.At 120 m long and with a diameter of 11

    More...
     

Share This Page