SILVER CREEK project

Wolfgang Dudler May 24, 2009

  1. DSP&P fan

    DSP&P fan TrainBoard Member

    424
    0
    11
    Currently, I have a rotary switch...but it isn't installed (I'm concerned about it not being dummy proof since, well, I'm a dummy sometimes!). I hope to install it soon. I'll look into the servo motors...sounds like a fine idea.

    Michael
     
  2. Wolfgang Dudler

    Wolfgang Dudler Passed away August 25, 2012 TrainBoard Supporter In Memoriam

    3,794
    353
    49
  3. Wolfgang Dudler

    Wolfgang Dudler Passed away August 25, 2012 TrainBoard Supporter In Memoriam

    3,794
    353
    49
    The second, last crossing is in work. You see, this crossing is also next to the segment border. This time I build it in place. When all rails are glued / soldered I cut the rails and separate the segments. You see I've a mix from PC board ties and Kappler ties.

    [​IMG]

    Wolfgang
     
  4. Wolfgang Dudler

    Wolfgang Dudler Passed away August 25, 2012 TrainBoard Supporter In Memoriam

    3,794
    353
    49
    Finished. Now comes wiring. The hardest part were the tiny inner guard rails. :angel:
    Remember: H0n3 code 55.

    [​IMG]

    Wolfgang
     
  5. BoxcabE50

    BoxcabE50 HOn30 & N Scales Staff Member TrainBoard Supporter

    67,671
    23,157
    653
    Wolfgang-

    What type of soldering equipment do you use? A low wattage pencil?

    Boxcab E50
     
  6. Wolfgang Dudler

    Wolfgang Dudler Passed away August 25, 2012 TrainBoard Supporter In Memoriam

    3,794
    353
    49
    This time I've build the crossing in place, at the segment. So I used my usual iron, 30 Watt. It's not a pencil tip. :angel:
    [​IMG]

    At my desk I've a soldering station. There I soldered the first crossing, with 400°C, 750°F.

    Wolfgang
     
  7. gregamer

    gregamer TrainBoard Supporter

    1,258
    405
    31
  8. Wolfgang Dudler

    Wolfgang Dudler Passed away August 25, 2012 TrainBoard Supporter In Memoriam

    3,794
    353
    49
    Yes, the frog juicer is a good device. But I have to stay with a few switches, these are less expensive.

    And here more work. I've soldered and glued down the first stub switch. This is - like all narrow gauge track - code 55. I have still to build my usual push pull device.

    [​IMG]

    And I have started finishing the two bridges.

    Wolfgang
     
  9. Wolfgang Dudler

    Wolfgang Dudler Passed away August 25, 2012 TrainBoard Supporter In Memoriam

    3,794
    353
    49
    The bed of the creek has got a first paint layer.

    [​IMG]

    But blue doesn't look right. So I airbrushed some thinned black.

    [​IMG]

    [​IMG]

    Last step I airbrushed some dark green.
     
    Last edited by a moderator: Sep 11, 2009
  10. Wolfgang Dudler

    Wolfgang Dudler Passed away August 25, 2012 TrainBoard Supporter In Memoriam

    3,794
    353
    49
    With the dark green it looked good. Now I poured glossy varnish into the creek. It was necessary to level the modul. :angel:
    The modul border was taped.

    [​IMG]

    [​IMG]

    This remembers me the land where milk flows.
    Well, in a few days I will see.

    Wolfgang
     
  11. Wolfgang Dudler

    Wolfgang Dudler Passed away August 25, 2012 TrainBoard Supporter In Memoriam

    3,794
    353
    49
    Now all track is laid down, only the mine spur missing.

    [​IMG]

    I have to wire the segments, then I can test run. And take more pictures. :angel:

    Wolfgang
     
  12. Wolfgang Dudler

    Wolfgang Dudler Passed away August 25, 2012 TrainBoard Supporter In Memoriam

    3,794
    353
    49
    ... and the stub switches are moving!

    [ame="http://www.youtube.com/watch?v=ix8PN9p0mh0"]YouTube - stub switches[/ame]

    Wolfgang
     
  13. mtaylor

    mtaylor Staff Member TrainBoard Supporter

    2,772
    185
    49
    You do some amazing track work!!
     
  14. stewarttrains98

    stewarttrains98 TrainBoard Member

    880
    0
    18
    Love the progress that you are making. Love the pictures as well, so far great job.
     
  15. Wolfgang Dudler

    Wolfgang Dudler Passed away August 25, 2012 TrainBoard Supporter In Memoriam

    3,794
    353
    49
    First train to Silver Creek

    Silver Creek is ready for operation.

    [ame="http://www.youtube.com/watch?v=Q7_4KLpbhy8"]YouTube - First train to Silver Creek[/ame]

    Wolfgang
     
  16. N7CZ

    N7CZ TrainBoard Member

    352
    53
    11
    Woohoo! Congrats Wolfgang! I'd love to be riding in one of those open tourist cars! :D
     
  17. BoxcabE50

    BoxcabE50 HOn30 & N Scales Staff Member TrainBoard Supporter

    67,671
    23,157
    653
    More photos, please!

    Boxcab E50
     
  18. Wolfgang Dudler

    Wolfgang Dudler Passed away August 25, 2012 TrainBoard Supporter In Memoriam

    3,794
    353
    49
    Here you're! :angel::angel:

    [​IMG]

    [​IMG]
     
  19. Wolfgang Dudler

    Wolfgang Dudler Passed away August 25, 2012 TrainBoard Supporter In Memoriam

    3,794
    353
    49
    ... and...

    [​IMG]

    [​IMG]

    [​IMG]

    Wolfgang
     
  20. mtaylor

    mtaylor Staff Member TrainBoard Supporter

    2,772
    185
    49
    Very cool, Great job!
     

Share This Page