Richard Newmiller MMR, PRR Dresher Division

Bfagan Feb 19, 2024

  1. Bfagan

    Bfagan TrainBoard Member

    486
    313
    19
    Richard Newmiller MMR, PRR Dresher Division
    Construction started 8/2016, and the layout was completed in 7 years.
    This free-lanced prototype HO scale layout set in the mid-1960s is a walk-in design occupying a 14 ft. x 20 ft. area with 490’ of track. The dual track mainline leaves Greenwich yard, climbs a 2.25% grade into the mountains and interchanges with the saw mill and logging businesses. Operations are enhanced with 3 staging tracks, team tracks, passing sidings, multiple crossovers and 28 switching sidings that serve 30 customers. The NCE-DCC layout has multiple scratch built, exceptional quality structures, 3 of which earned the Best-in-Show award in judged NMRA contests. Scenery is complete, all motive power is sound equipped.
    Mainline Eastbound:
    Mainline Westbound:
    Caboose View Mainline:
    Logging Westbound:
    Flyover:
    Slide Show: https://youtu.be/UQ3DNq7scxs
     
  2. Mike VE2TRV

    Mike VE2TRV TrainBoard Member

    4,964
    12,904
    93
    That's great! Thanks for sharing that.(y)
     
  3. Bigfoot21075

    Bigfoot21075 TrainBoard Member

    52
    163
    6
    I am simply in awe.
     
    Mike VE2TRV likes this.
  4. RhB Michael

    RhB Michael TrainBoard Member

    42
    198
    3
    Great looking railroad.
     
    Mike VE2TRV and Bigfoot21075 like this.

Share This Page