Here is the start of the Cushing-Laketown RR in HO

wisconsinjimmy Jan 28, 2014

  1. wisconsinjimmy

    wisconsinjimmy TrainBoard Member

    158
    0
    6
    RR 001.jpg RR 005.jpg RR 006.jpg RR 007.jpg
    Not the best pictures and to start this is a 4x8, I have the outside track (main line) and the inside track for local and industry, I am wondering if I should run the sort tracks right on the table. I am up in the air about scenery as I am just looking for switching and sorting.
     
  2. BoxcabE50

    BoxcabE50 HOn30 & N Scales Staff Member TrainBoard Supporter

    67,696
    23,258
    653
    Yes. You can run your sort tracks right on the table. A lot of yard and industry tracks lack the raised right of way and ballasting of a main track.
     

Share This Page