Construction started

Keith May 7, 2009

  1. Keith

    Keith TrainBoard Supporter

    4,596
    2,082
    88
    Ballast on entire layout held up great.
    That just happened to be a rather nasty low spot!
    As was the section inside the east end curve.
    However, both areas seemed to have drained fairly quick, after rain stopped.
    I just added drainage pipes to help drain things the next time.
    And since then, it has not rained! Or at least not hard enough to flood.
    Again, won't know anything about frost heave until winter sets in.
     

Share This Page