    Resurrection of Barleycorn Junction 1998-2003-2012

    1) All rolling Stock must be removed to another location for cleaning, tuning & general operating maintenance. Including all trucks, wheels, couplers, weight etc.

    2) All structures must be removed to another location or remodeled on site.

    3) All trees and loose foliage will be removed and replanted after property grounds and operation have been restored to original condition.

    4) All foundations, utilities, infrastructure improvements, rail crossings & along with public access to Downtown Barleycorn will be updated.

    5) Must clean the 500 plus feet of code 80 rail, make sure all remote turnouts are in top operating condition. familiarize myself again with all the block and cab wiring, including turntable. All electrical work must work 100% at this point. Make sure all Panel controls are still like they need to be to make operation easier for the visitors.

    6 ) To be continued after Phase 5 is complete.

    [​IMG]

    2001

    [​IMG]

    2003

    [​IMG]

    2003


    All suggestions are very welcome. I'm ready to start back in 2012, I'll do the work !

    Thanks in advance, Carolina Cliff
     