Highway Overpass. Made primarily from wood, with brass railings on the North side and plastic rails on the south side.
A few added details. Added running boards and guardrails painted and weathered to.
IM F3 on viaduct with RS4/5 working below.
The river valley and viaduct really show up well in this picture.
The rock work is a pre-made foam mold that has been painted the same rock colors as the plaster.
All the rock work is hand carved and made from plaster.
All rock work is hand carved and made from plaster.
All rock work is hand carved and is made from plaster.
The clam shell and cables were added for extra realism.
View 22 of old Layout showing control pannel. 4 separate trains may run on Selenium Rectifier control, or all may run on MRC DC control, as...
View 20 of old layout, showing viaduct and Atlas turntable.