Made south and east shelves narrower. Removed Seattle Pottery. Reoriented yard lead to extend through clost wall. Use #5 turnouts for yard ladder....
Turned Odom Lead into a run around. Moving the Hole, removed rail to Seaport Maintenance.
In this version. I've moved the Industrial Lead East to create the Odom Lead spur next to Seattle Lighting. I've created a runarond in the yard....
Rearranged tail track and yard to avoid running it through the wall in to the closet. This will make it easier to switch. It also makes the yard...
The Industrial Lead HO Switching Layout. Based on BNSF served industries in SODO Seattle.
Freight passing passenger at station
Z scale Micro structures etched brass kits- Parkway Diner, Gulf station and Triangle Hotel.
Z scale shelf layout freelance Typical PA coal mining town. Block wired two cab switching operation. 2 foot by 4 foot foam core base. Very light...
This was going to be my whole layout support system, kind of an adjustable layout, but it is too damn flimsy. I suppose I can bolt joists to the...