Roof in place over 3-track hidden staging, with mockup front wall. Dockside cargo shed fronts and roofs will cover 6 feet of staging with ships...
Pad floor surface masked for spraying edges with rusty/ masonry color. Thumb tacks dab painted to be less uniform.
Pad & thumbtacks painted flat black. Pad speckle painted with a beige muddy spray after edges masked and screws protected with...
Pads from mop sponge cut to needed length, with removed pieces. Arrow points to accidental nick to hide. Holes drilled in round mold bumps to...
Mop sponge connector looked like a barrel vault roof. Pads removed from sponge, fastener knobs kept to simulate some kind of vent.
I needed a simple paint booth for acrylics, so this is the finished booth. Total cost of this was around $60-70 dollars.