Last section of south deck installed. Oops I cut it 1" too short.
East and South valance frames drilled for attaching togehter.
East and South valance frames clamped for drilling.
East valance frame skin added.
East valance frame.
South valance frame in progress.
first benchwork pics of the line. the plywood for the tracks will soon be ready.... hold on!!!
first benchwork pics of the line
Although many people think of open grid benchwork as just a support for a flat overall tabletop, in fact the best use is when combined with risers...
Diferent angle....not sure with the size (too large) but it´s done...hehehe
General view.
Plywood on place
Starting the benchwork in the very very small room.
plywood topped sectional benchwork in place. Glue+staples hold the plywood to the dimensional timber, which is screwed together. Sections are...