Mark Dance

Two new Castlegar panels to replace the 3 previously there. These are larger, angled upwards to aid viewing from above, and more closley represent the actual track configuration at Castlegar. 18 switches are remotely thrown from this panel while the industrial trackage at Kraft (to right of this picture) uses manually thrown turnouts.

Two new Castlegar panels to replace the 3 previously there.  These are larger, angled upwards to aid viewing from above, and more closley represent the actual track configuration at Castlegar.  18 switches are remotely thrown from this panel while the industrial trackage at Kraft (to right of this picture) uses manually thrown turnouts.
Mark Dance, Jan 15, 2011
    There are no comments to display.
  • Album:
    C&W Operations
    Uploaded By:
    Mark Dance
    Date:
    Jan 15, 2011
    View Count:
    194
    Comment Count:
    0