Royal Morovian Railway
This is the 3' long HO version of the Bietschtal, narrowed from two HO track width to a single N track and wide walkways. Catenary masts are mounted along the walkway and connect at either end to the tunnel entrances. This was an addition to the original layout, taking over 100 hours to build and detail the mountain on the left (not seen here) and the valley beneath.
-
There are no comments to display.
-
- Category:
- Layout Photography
- Uploaded By:
- Bob F
- Date:
- Jan 9, 2009
- View Count:
- 1,054
- Comment Count:
- 0