Pair O Dice module progress
This is the new sawmill side. It will have the centerbeam loading track, and boxcar loading on the right side, and on the left front are the 2 woodchip loading tracks.
-
There are no comments to display.
This is the new sawmill side. It will have the centerbeam loading track, and boxcar loading on the right side, and on the left front are the 2 woodchip loading tracks.