P1010008
Colton yard throught. The track in the foreground on the left is the mainline and the right is the the yard drill track. The tracks in the center left to right are the mainline and two arrival departure tracks. The rest of the yard and some industries will be on the right.
-
There are no comments to display.
-
- Category:
- RailImages Member Galleries
- Uploaded By:
- jhn_plsn
- Date:
- Sep 13, 2006
- View Count:
- 774
- Comment Count:
- 0