BarstowRick

HPRR Move 1

Not pretty but repairable.

HPRR Move 1
BarstowRick, Nov 29, 2018
    • BarstowRick
      The control panel visible in the picture handles the mainline both up and back to the lower level. Dual train operation. Wired to DPDT toggles for Cab A and Cab B.
    There are no comments to display.
  • Category:
    Layout Construction
    Uploaded By:
    BarstowRick
    Date:
    Nov 29, 2018
    View Count:
    703
    Comment Count:
    1