Gigi Crossing the Bridge
This is the liftoff section that connects the original Phase 1 with the new Phase 3 of my layout. I've got the foam rough-cut for the river bed, and the girder deck of what will be a truss bridge in place. On the model, the deck holds all the weight and the truss section is just decorative.
-
There are no comments to display.
-
- Category:
- RailImages Member Galleries
- Uploaded By:
- MisterBeasley
- Date:
- Aug 31, 2014
- View Count:
- 213
- Comment Count:
- 0