Basic construction
Celluclay to fill cracks and crevices and modify surface of styrofoam terrain base.
Layers of styrofoam glued together.
Sprinkle ground foam. Add trees and serve.
Using layers of styrofoam.
The train begins slowing down to give tourists onboard a good shot of the gorge at Brockways Mills
The flyer has begun its return trip back to Bellows falls and is seen again at bartonsville
After dumping the coaches on the back track the 405 runs around her train on the mainline