The Battle Mountain section was installed and the temporary end loop section was moved. Industries at Battle Mountain are still being worked on.
This is right after the Harney section was installed into the layout. The tracks have been connected to the existing layout and to the test loop...
Basic bench work for 8 ft long Battle Mountain section.
Hello... it's been quite a while since I've posted on Trainboard (mostly in the N scale area), but I am in desperate need of help and hope that...
For those who like to see layouts in progress, here is a video of the progress I've made on my layout the past 4 or 5 months. [MEDIA]
This view of the Cat Litter warehouse building from behind shows how long flat head screws and small magnets stuck to the inside of the roof hold...
Under construction photo of scratch built warehouse in Battle Mountain
Working on the wiring under the Battle Mountain section of the layout, Oct. 20, 2017
Track work completed on Battle Mountain section of layout, Oct 20, 2017.
Here is my new video about how to b use mock-ups in scratch building and kit bashing moder railroad structures. Please comment with you ideas,...
Mock up of highway overpass at Winnemucca.