Truss bridge base with partially-cut gap
There will eventually be "water" under the bridge, with a deeper cut all the way through the top layer and into the second. Here it's just cut enough to fit the girder section in so the track meets up with the roadbed.
-
There are no comments to display.
-
- Category:
- RailImages Member Galleries
- Uploaded By:
- MisterBeasley
- Date:
- Aug 10, 2014
- View Count:
- 222
- Comment Count:
- 0