Turtle Creek Central part Four

John Moore Aug 5, 2020

  1. John Moore

    John Moore TrainBoard Supporter

    13,422
    12,271
    183
    Got an early morning delivery from DHL the last of my supplies from Japan. Got a package of single track catenary steel masts along with some more Kato couplers and my last order of Tomix pantagraphs.

    Decaled the new electrics last night and now with the pantagraphs on hand I am ready to install them.

    I really like the way these locos close couple yet have no issues with 7 and 8 inch radius I can snake these locos down on the port's tight trackage with no issues.
     
    SP-Wolf and Carl Sowell like this.
  2. John Moore

    John Moore TrainBoard Supporter

    13,422
    12,271
    183
    Installed pantagraphs on one set of electrics tonight and I like these Tomix 0234 pantagraphs better than the Tomix 0242. They are mostly metal and more rugged than the 0242 which are all plastic yet with just as fine detail.

    I measured the distance between a coupled pair and it is only 1.5 N scale feet yet these locos go through my 6 inch radius curves to the piers in the harbor without a hiccup. I have Kato 11-109 mechanisms under them with Kato 11-707 couplers installed. These couplers play well with MTs and all my Japanese locos have these now installed. The Kato 11-109 mechanism is only a two axle mechanism but the sides are done so you have to really look to see that. I have no performance issues as far as electrical pick-up. This is the redesigned former 11-103 that Kato reworked. Yesterday I had 4 locos with 31 cars running no heating of the power pack or the locos even though I ran them for more than an hour. I give a big part of the running quality to the use of Kato unitrack and their superior electrical connections. Daggone track is near bullet proof. And these mechanism are geared for a realistic scale speed.
     
    SP-Wolf likes this.
  3. John Moore

    John Moore TrainBoard Supporter

    13,422
    12,271
    183
    SP-Wolf likes this.
  4. John Moore

    John Moore TrainBoard Supporter

    13,422
    12,271
    183
    I am concluding Part Four of the Turtle Creek saga with a group shot of the electric locomotives I have created over the last five weeks. Part Five will resume with the electrification of part of the port in a few weeks to a month from now.
     
    SP-Wolf likes this.

Share This Page