Los Angeles, Pasadena & Cucamonga RR (HO Scale)

Yannis Dec 30, 2017

  1. Yannis

    Yannis TrainBoard Member

    188
    311
    9
    Thank you very much Tom!
     
  2. Yannis

    Yannis TrainBoard Member

    188
    311
    9
    Hi all,

    Made some progress on the layout during the last few weeks. I managed to finish off roadbed (5mm cork), trackwork, tortoises, wiring, fascia and a lift-gate.

    I can now run trains but i still need to finish off the control panels for the tortoises so that i can do switching as well. The 30-31" radii curves with easements proved adequate for full length passenger cars and long consists.

    A few photos of the progress follow, many thanks for your time and replies
    Yannis

    Roadbed work
    Roadbed3.jpg
    Turnouts in place right before the turn to the depot area
    Tracklaying4.jpg
    Finished trackwork in a part of the industrial area south of the depot, right after the turnouts
    Tracklaying6.jpg

    Wiring along the front of the benchwork. Feeders every 3'.
    Wiring1.jpg
    Lift gate locked into place as seen from under the gate itself. Some of the locking/alignment locks can be seen.
    LiftGate1.jpg

    Lift gate at its "rest" position. Kept into place with wooden supports that will evolve into buildings.
    LiftGate2.jpg
    The other side of the benchwork where the gate locks into place. Three spring loaded locks used in different angles for 3-axis alignment and two brass barrel locks used on each side that act as safety switches. Unless they are locked, no power is on the tracks, so no flying trains here.
    LiftGate3.jpg

    Lift-bridge locked in place, a Super Chief is about to pass through.
    LiftGate4.jpg
    Hinge detail
    LiftGate5.jpg
     
  3. Yannis

    Yannis TrainBoard Member

    188
    311
    9
    More updates on the layout's progress...

    I finished off the fascia, installed curtains for the skirting and more importantly (for me) finished off the work on the fascia control panels. These are made out of styrene. They are painted with hammered effect paint and acrylics. I hope you like them and thanks for stopping by!

    Primed panel
    Panel1w.jpg
    Painted with the basic color
    Panel2w.jpg
    Panel madness...
    Panel3w.jpg
    Installed, pending labels
    Panel5w.jpg
    Final result
    Panel4.jpg
     
  4. dalebaker

    dalebaker TrainBoard Member

    1,608
    1,885
    45
    Awesome work!!!
     
    gjslsffan and Joe Lovett like this.
  5. Yannis

    Yannis TrainBoard Member

    188
    311
    9
    Thank you very much Dale for the kind feedback!
     
    gjslsffan and Joe Lovett like this.
  6. RailMix

    RailMix TrainBoard Member

    1,532
    3,865
    60
    Very nice work on the panels, Yannis. They're sharp looking and guarding the toggle switches is a great idea for several reasons. Haven't seen that done before.
     
    Yannis and Joe Lovett like this.
  7. Yannis

    Yannis TrainBoard Member

    188
    311
    9
    Tom thank you very much for the kind words. The switches without a guard looked like they could pose a problem with jackets etc... catching on and causing damage. Better safe than sorry i guess. On top of that i really liked their contribution to the overall image of the panel (more industrial etc...).
     
  8. Colonel

    Colonel Staff Member TrainBoard Supporter

    8,721
    1,112
    119
    Looks great any issue under operations?
     
  9. Yannis

    Yannis TrainBoard Member

    188
    311
    9
    Thank you Colonel!
    No issues so far with operations, i had derailments in other unexpected places rather than on the bridge itself which i feared the most.

    It all seems to lock in place as it should despite shifts and bumps. I went a step further and did not solder the two pieces of flex track that span the bridge. This way i can make micro-adjustments to the rails if needed at any time in order to alleviate any issues in the future (with excessive or too-small, track gaps).
     
    gjslsffan likes this.
  10. VinceP

    VinceP TrainBoard Member

    1,937
    2,039
    44
    Just came across this liking what I see.

    Nice job so far.
     
  11. Yannis

    Yannis TrainBoard Member

    188
    311
    9
    Thank you very much Vince for the kind words!

    Hopefully i ll be able to post an update in the coming weeks.
     
  12. astrotrain

    astrotrain TrainBoard Member

    70
    73
    14
    Good work' Really liked your last layout also. I also love point to point. More pics :)
     
  13. Yannis

    Yannis TrainBoard Member

    188
    311
    9
    Thank you very much astrotrain. Will start working on a module soon.
     
  14. James Fitch

    James Fitch TrainBoard Member

    767
    496
    31
    Late to the party. Pretty fancy bench-work. Definitely more "exotic" with the furniture style pocket hole jig!
     
  15. Yannis

    Yannis TrainBoard Member

    188
    311
    9
    Thanks for the reply Jim. The pocket holes did make construction easier and sturdier in comparison to my previous benchwork. I ll definitely be using pocket hole construction on most of my future woodworking.
     
  16. Michael Good

    Michael Good TrainBoard Member

    166
    2
    17
    Fantastic work so far!
    Very solid bench work!
     
  17. Yannis

    Yannis TrainBoard Member

    188
    311
    9
    Many thanks Mike!
     
  18. gjslsffan

    gjslsffan Staff Member

    2,634
    5,760
    69
    Boy, this is sure a first class build. Wish I had your talents!
     
    Yannis likes this.
  19. Yannis

    Yannis TrainBoard Member

    188
    311
    9
    Thank you very much Tom for the very kind and motivating words! It is an honor to receive this kind of feedback from such great modelers.
     
  20. md11

    md11 TrainBoard Member

    82
    49
    16
    Hi Yannis
    Really nice work. I am looking forward to seeing more pictures and the progress on your layout.

    Have a great day and best regards from Switzerland
    Thom
     
    Yannis likes this.

Share This Page