Again, where is all that feedback coming from? I jumped out of my chair not realizing how loud this is...
I gotta sit down........ I am dizzy now, from the roundy round and those heights!! Sent from my Commando
After a move to a other Location the old shelf layout did not meet my expectations, So it was time for a new start. more to come
Towntest by cal_43spanish, auf Flickr Hi, thats not a Ikea shelf this one is called RS Regal and is from a smaller furniture store. Weekend work was drilling hole for whole elektric and put the cables under the layout , next step will be laying the rail and solder the connections.
Weekend work Coyote Gulch scenictest by cal_43spanish, auf Flickr a scenic test Coyote Gulch Trackwork by cal_43spanish, auf Flickr Coyote Gulch tracktest by cal_43spanish, auf Flickr Coyote Gulch trackwork by cal_43spanish, auf Flickr Finished the trackwork and did an analog testrun, next will be finish the electrics
Coyote Gulch RR worktrain by cal_43spanish, auf Flickr After doing the wirethings, the Coyote Gulch RR worktrain was on the track.
Before making the groundwork i did a test with my buildings on the layout , in comparison to my other buildings the woodland station is so huge that I think it´s not useable on this layout. Vergleich Station by cal_43spanish, auf Flickr
slow progress of the layout, CGRR Progress1 by cal_43spanish, auf Flickr CGRR Progress2 by cal_43spanish, auf Flickr CGRR Progress3 by cal_43spanish, auf Flickr
I have the same problem: not enough space to make broader curves. And with smaller equiment, it works fine, but I have some beautifull coaches from Rapido and they don't like that kind of curves........