Drywall is installed and sealed, ready for flooring.
Train Room South View - Dec 2019
A new top was installed on the work bench in August of 2018
This photo taken in late 2017 shows the Battle Mountain section under construction in the middle of the room before it was installed into the layout.
Train cabinet made from cabinet plywood and hard wood flooring for the drawer frames. Currently has 8 drawers with room for a couple more.
This cabinet sits under the staging yard. It is quite heavy and is on wheels. Each drawer can hold 77 standard sized Micro-Trains boxes. Heavy...