This top-mounted tortoise serves the turnout on the front track. Eventually the buildings will hide the tortoises and there will be a simple...
These tortoises are mounted upside down on top of the shelf because there is no clear space under this portion of the layout to fit them....
These tracks pass through a doorway and a duck under to get to a helix or to staging areas to the left and through another doorway to get to...
The tortoise serves a turnout on the top level.
Installing Tortoises on all turnouts along the left side of the picture lets an operator stand in the Keystone aisle (located just right of...
Rod Mill and CNW Highline at left, New KS North Yard and KS scale house in middle, Luria Bros' Yard right of center, and Luria Bros in distance....
Open Hearth Furnace, Electric Arc Furnace (blue roof behind gon), Soaking Pits Bldg, and Billets Blooming Mill. Since this pic was taken, the...
Nearby tracks lead to the Marshalling Yard, and the cardboard mock-up of the rail gantry is over the furnace charging car tracks.