Stacy Yard. Seattle. 12/06/2009
from the Coloroda Main. Stacy Yard. Seattle. These cans will be unloaded at BNSF's Seattle International Gateway (SIG) Intermodal Yard. 11/30/2009
DTTX56132 - Gunderson Husky Stack in the original Trailer Train TT paint scheme, Winslow AZ, 23 April 2006
Both Kato engines added white handrails, BLMA cab sunshades an lightly weathering
UP double stack at south end of Steilacoom, WA
BNSF Double Stack at south end of Steilacoom, WA
Alan Curtis Gunderson Stack Cars Works in Progress (1st set out of 7)
Increasing the clearance of the first loop by about 2-3mm by reducing a 3-ply spiral to 2-ply. Note that this is actually still tighter than my...
Testing helix track while laying with a six axle engine as well as the two longest and the two tallest cars I could find. Here we see a double...
BNSF eastbound stack train in Kingman Canyon AZ (August 2006)
Santa Fé C44-9W # 669 and Santa Fé SD 40-2 # 5092 with stack train
Here is what remains of the boiler. I hear that it is no longer inside so the stack remains.