Finishing up the basic tunnel construction and interior so the upper level can be installed and track laid for the Branch-line.
Seattle. 1/22/2010.
Just completed the tunnel and lid for the west protal area.
Weathered with a wash of Cement, then Grimy Black.
Pola Double Track Tunnel Portal Painted with Floquil Cement wash.
Pola Double Track Tunnel Portal
All rock work is hand carved and made from plaster.
All rock work is hand carved and is made from plaster.