Over All Industry Area
Fully Extended - Over All
Fully Extended - Right Side
Fully Extended - Left Side
Half Extended - Left Side
Tunnel walls are made from Basalt Paper that is made by Faller.
The river valley and viaduct really show up well in this picture.
Over all view of the layout including the viaduct and two mountains. The mine in the foreground is scratch built and is not completed yet.
Once again showing the yard and very straight yard tracks.
Got to get those yard tracks straight! Over all view of the passenger station and platform/industry/yard area. The rocks near the parking...
Passenger station and industrial area. Yard maintenance area and a signal tower. The unfinished scratch built mine is the upper right hand...
Passenger platform with the actual passenger schedules from the Erie Lackawanna Railroad shrunk down to 2 point font using Word and a color printer.
West side of yard.
Scratch built coal mine and some of my favorite trees on the layout.
The small rocks towards the left of this picture are actually made from kitty liter. In the foreground the pilings are made from dowels. The...
The rock work is a pre-made foam mold that has been painted the same rock colors as the plaster.