Alternate Plan with #8 turnouts and 28" minimum radius curves.
#6 turnouts & 24" radius minimum curves.
Three 48" modules to make a riverside scene.
12' modular scene.
Staging is partially behind a oNeTrak module Then comes to the foreground.
Instead of helices to staging, staging is in front of modeled area, two inches below model.
Two Helices connect lower staging to upper scenicked layout with slots for two modules. oNeTrak and NTrak. Double Main run of 230 inches.
Atlas Turnout Power Routing
for Halland Yard, Union Station and surrounding turnouts. This is a preliminary track diagram. I printed it on a transparency, so I can check...
Track layout of Helper Yard as it appeared just after the DRGW and SP merger (1997).
Wiring diagram turnout test module to DS64 and Tortoise.
Added three inches to Riverside Industrial Area. Added industrial area above Riverside.
Wiring Schematic for DS 64. DS 64's wired to Tortoise motors, panel push buttons, panel LEDs.
Please check out the thread entitled: "Wiring Lighting Using Switches and Barrier Strip Blocks?"
Bus wiring of some lamps, with Switches (S) and Resistors (R)