In the low space It will be 2 dead lines for depots.
Left side.
Close up.
Well I finely the benchwork is finished and the electrical....but I am not really Ok with the level 3 and It need more auxiliar lines I think...
Well I finely the benchwork is finished and the electrical....but I am not really Ok with the level 3 and It need more auxiliar lines I think...Im...
Showing the new ramp to level 3.
Well here they are the 3 levels...next step: roadbed.
General view of the level 3...consecuenses of change: no espace for turntable.....for now.
Turnout changed to the rigth side. I didt like the way of the ramp to level 3, too close to level 2.
Waiting for the level 3.
Here's my test train sitting pretty atop support #7. This is about 3/4 of a loop from the end of the helix - nearly finished.
Screwed supports to base. Screwed spiral ramp to supports. Gave up on the fancy around-corners flexible drill extension; as it just can't apply...