Tad - thanks for the feedback. I'm moving forward as planned - it makes sense, I just needed confirmation.
Many interesting answers to the question, I especially like the optimism expressed in the responses that indicated that someone was working on...
I am wiring a newly completed layout (track is laid - the layout will likely never be "complete") which will be the first that I have done for two...
sd90ns - Thanks for the link to the Humpyards. They look awesome and I like the manual control aspect.
Mr. Stuard - thanks for the reply. To clarify, I will be using dpdt toggles for the switch machines. The Atlas controller is their proprietary...
I am in the process of getting an N scale layout running, I have installed my mainline track with 8 blocks and a reversing section. I an working...