I feel like that every day...Wish I could spend some days sleeping though. Unfortunately the alternative is grim, so gotta keep plowing ahead.
I think your helper is there because of the heater. :LOL:
I'm driven by goals and so this Winter Layout Party was a good focus for me to get things done, to have some trains running. Otherwise I'm all...
I feel I'm forever stuck in the benchwork or tracklaying or electronics or something else phase. :( I keep seeing people doing structures and...
My update for this week: West-end staging panel powered up and tested, turnouts added to the LCC IO boards, looks nice, I can run a locomotive...
Try applying some Bleach or Hydrogen Peroxide on an isolated yellowed area, and see if that whitens it up. Aside from that, if you have denture...
There's also DaVinci Resolve (there's a free version), but it might be excessive for this crowd (until you make it big on YouTube). :)...
Most known OSS video editors: https://www.openshot.org/ https://kdenlive.org/en/ edit: not meant to steal nscalestation's thunder or anything :)
Of course it supports the Wi-Throttle protocol, but beside a very slick look and ergonomics, LCC is one of the major reasons the throttle stands...
If you don't need a Command Station right away, wait for the TCS one - should be out coming soon. It will include support for the new NMRA LCC...
ppuinn, of course that gas problem HAD to be in the most inaccessible spot, in the furthest corner, of the widest section of the 2nd deck. LOL....
WAGO connectors are very nice and fancy, definitely a great choice nowadays, especially if you want an easy way to get to run trains fast. :)
My update: - Finished Staging West electronics panel, all in place, programmed and tested. [IMG] - McGuyvered a motor for the 3-Way switch at...
I used Aleene's Tacky Glue because I wanted it easily removable, in case I need to change things or rip it all up. :) EDIT: I only put a tiny...
Hi Tim, Just a heads-up that with 3M ATG the track does not remain in place. I've used it throughout my entire staging (12 long tracks, 2...
Hi okane, Thanks, TrainzLuvr goes back a long time (started with a website https://trainz.luvr.net for the Trainz Sim). Since the layout will...
Hi okane, You have too much track at the very back of the benchwork. I would swap the entire setup and move the yard to the front and the...
Today, after finishing work (1/2 a day, yay) and lunch, I built a CDU (Capacitor Discharge Unit). A cruddy looking, dremel cut, PCB traces. Oh...
Work on the electronics in staging has begun in earnest. Still need to build another Railcom IO board for this panel, and a CDU, then onto running...
I'm done with the temp main, all the track is in place except for the lift-up bridge. [IMG] Would love to have a full loop already, but since I...