Here is an aerial shot just after laying all tracks: It's one module consisting of two segments. The industries will be: Top left: Stamping Top right: Bakery Bottom right: Scrap yard Between stamping and bakery is a non rail served industry. To the right there is a small extension board attached serving as a micro fiddle yard and to be able to use the rightmost turnout. Some more pictures here: "Somewhere Southwest"
That building looks incredibly realistic. Post that anywhere else than on a model RR forum, and one would think it's evidence in a vandalism case...
But that tank car just went thru a very severe rain storm. And the bakery needed the corn oil NOW. They told the RR send it dirty car or not. LOL