Concrete ties

Eagle2 Aug 12, 2003

  1. Eagle2

    Eagle2 Staff Member TrainBoard Supporter

    5,727
    479
    82
    I've seen that a lot of the new construction si being done on concrete ties. I'm curious to know whether US railroads also do turnouts on concrete, or do they still use wood ties? I noticed this here in Iraq, where the lines are laid on concrete ties, but the turnouts are on wood. What is the American practice?

    Side note: probably European in idea, but even on the wood ties, the Iraqis use clips instead of spikes.
     
  2. Doug A.

    Doug A. TrainBoard Supporter

    3,509
    161
    59
    This is commonly done in the US as well. Most concrete track in the West will be accompanied by wooden turnouts, mostly because the custom ties needed for turnouts become very expensive without the economies of scale for the miles and miles of continuous mainline. Having said that, concrete turnouts do exist and are becoming more commonplace. A recent trip to the Powder River Basin revealed many in place and several in process of being installed. Also, the Alameda Corridor in LA has concrete turnouts throughout.
     
  3. Martyn Read

    Martyn Read TrainBoard Supporter

    1,990
    0
    33
    Same over here in the UK. Technology for concrete turnouts is starting to be used, gradually.

    "Standard" Concrete ties have been in use from the 60's (maybe even before?) but turnouts were always wood, mostly because they vary a lot more than plain track.

    Clips of some variety are the standard fastener for flat bottomed rail over here, wether on wood or concrete. I'm not sure we use spikes at all. ("Traditional" UK track has a bullhead rail which sat in chairs bolted to wooden sleepers, with a wood block or metal clip holding the rail in place on the chairs.)
     
  4. beast5420

    beast5420 TrainBoard Member

    760
    37
    28
    saw several about to be installed while on vacation. took pictures, but they didn't turn out :( . this was between lusk and orin wyoming.
     
  5. LCSO_927

    LCSO_927 E-Mail Bounces

    60
    0
    19
    UP recently replaced long sections of track on the Cascade Subdivision in Oregon. The ties are still wood, but they are using clips instead of spikes.

    Mike
     
  6. porkypine52

    porkypine52 TrainBoard Member

    1,131
    306
    36
    The way I understand it, clips are used with concrete ties because there is no other way of holding the rail to the tie. You can't drive a spike into concrete. Clips will also let a rail "float" a little, so the rail will not pull loose from the ties. Watch a rail that is spiked to a wooden tie, as a train truck goes over it. See the rail move up amd down with the passing of the trucks. This is what pulls spikes loose. Clips will give a little and keep the rail firmly on the ties.
     