COAL YARD you cant see from ground and modeling ideas

DJ of DJsTrains May 18, 2023

  1. DJ of DJsTrains

    DJ of DJsTrains TrainBoard Member

    308
    623
    15
  2. mmi16

    mmi16 TrainBoard Member

    742
    1,368
    40
    Yards such as Shire Oaks and Newell are the staging areas for coal trains out of Southwest Pennsylvania. Coal trains start when the Shipper (Bailey or some other mine) gives the carrier an order for a train to load. The order can specify rotary dump bathtub gons, open top bottom dump hoppers, a private owner train set or a blanket number of cars of any open top loading kind. The support yard assembles the train that the Shipper wants and a crew with road power will take the train to the mine, load it and return the loaded train to the support yard. Road crews will be called from the support yard to start moving the loaded train to its ultimate destination - the destination may be a Export Coal Pier or a domestic industry or power plant. At destination the trains will be emptied and the cars returned to the support yard for future loading. The 'Coal Department' of the line haul carriers are the ones that supervise the movements of coal and empties on their carriers.

    As a young adult I lived in Bethel Park and used to go out for drives around the area in my Triumph TR-4a, often passing the Elrama Power Plant - late 1960's
     
  3. HemiAdda2d

    HemiAdda2d Staff Member TrainBoard Supporter

    22,063
    27,716
    253
    Hytec, DJ of DJsTrains and Hardcoaler like this.
  4. mmi16

    mmi16 TrainBoard Member

    742
    1,368
    40
    In most case of coal going to power plants, the cars are owned by the electric utility. Because the utility is supplying the cars, they get a rate break over what they would be paying if the railroads were the one supplying the cars. Most utilities have more than a single set of equipment that they own. In some cases, a set of equipment may get held at the power plant so that the utility's maintenance contractor can fully inspect and make the necessary repairs to keep that set of equipment rolling for its next hundred thousand miles or more.
     