Hand laying track

White River Line Feb 12, 2022

  1. White River Line

    White River Line TrainBoard Member

    65
    98
    4
    I've got a new video out on hand laying track. I'm a beginner, so I don't if this is really a how-to with any authority behind it, but maybe you've got some suggestions.

     
    gmorider and Sumner like this.
  2. r_i_straw

    r_i_straw Mostly N Scale Staff Member

    22,265
    50,075
    253
    Great video. I have heard hand laying track is "Modeling" track. I have done a little of it. Mostly turnouts for Nn3. But then I go to flex track between the turnouts. I am too impatient and want to get things running ASAP. Some folks derive a lot of pleasure and sense of accomplishment from hand laying track but it ain't me. I did build a long curved N scale turnout for a friend's layout to fit a requirement that he had. It turned out well and worked flawlessly after installed. I also have a few hand laid N scale turnouts on my hollow door test track. I built those just to see if I could. However I guess this old dog will just stick with manufactured turnouts and flex track from now on. Thanks for the video. I am sure there are many folks out there who will benefit from it.:)
     
  3. Shortround

    Shortround TrainBoard Member

    4,379
    5,193
    93
    I have watch another doing it. I felt it would be too challenging and time consuming.

    Richard
     
  4. White River Line

    White River Line TrainBoard Member

    65
    98
    4
    @r_i_straw I hope some people do benefit from it. I had a friend that did a lot of hand laying track and, HOn30, On30, G and I really liked the way it looked. I've built my own turnouts for this layout as well. I got a lot of pleasure and a sense of accomplishment from even this small bit, but I certainly understand why not too many people do it. There a lot of different ways to enjoy this hobby.
     
  5. White River Line

    White River Line TrainBoard Member

    65
    98
    4
    It is certainly time consuming, but I didn't find it to be as challenging as you might expect. But then again I enjoy slowing down, taking my time, and paying attention to details.
     
    Shortround likes this.
  6. gmorider

    gmorider TrainBoard Member

    2,111
    6,352
    65
    All my track is hand laid. 'Jus so ya' know. ;)
     
    White River Line likes this.
  7. hawkdriver

    hawkdriver TrainBoard Supporter

    101
    236
    8
    Great video!
    Hand laying track takes a great deal of patience.
    I have tried many years ago and I had to do it, redo it, redo some more.
    Rails drifted out of gauge as I pinned.
     
  8. White River Line

    White River Line TrainBoard Member

    65
    98
    4
    I've got some ideas that might make this go a bit faster and more accurately for me. If you are interested keep an eye out for the video in the next few months.
     
  9. COverton

    COverton TrainBoard Supporter

    1,939
    179
    36
    Rapido or someone else offers three-cornered gauges for holding the rails in gauge while you do whatever it is you're doing with them. I think one on either side of the work site, say within 6", and then a quick check with the NMRA gauge before putting in every three or four spikes oughta do it.
     
  10. White River Line

    White River Line TrainBoard Member

    65
    98
    4
    Yes, I plan on getting some of those 3 point gages.
     

Share This Page