Project 368

zdrada69 Nov 14, 2016

  1. Joe Lovett

    Joe Lovett TrainBoard Member

    1,608
    4,575
    62
    Looks fantastic Pawel!!!

    Joe
     
    zdrada69 likes this.
  2. zdrada69

    zdrada69 TrainBoard Member

    1,110
    4,344
    51
    This line was closed in 1996 for regular service. There were some touristic trains at the beginning of XXI century and on some part there are trolleys in use. There is a discussion to reactivate this line but costs are high due to necessary reconstruction and repairs of bridges. We will see...
     
  3. bostonjim

    bostonjim TrainBoard Member

    846
    1,105
    27
    Thanks, Pawel. Let's hope they re-open it. Jim
     
  4. SJ Z-man

    SJ Z-man TrainBoard Member

    3,015
    1,025
    62
    Rob (and other T-Track'rs):

    THIS is what I have been recommending to build like, the non-flat boring of Z-Bend Track and T-Track-Z. I have seen this with the Washington DC group, Zmod in Scandinavia and Altenbeken modules. By changing scenery slopes, one can envision a 'grade' and with a track setback (T-Track-Z has 1" more than ZBT), it makes the trains more 'distant' and reality of the scenery in front.
     
  5. zdrada69

    zdrada69 TrainBoard Member

    1,110
    4,344
    51
    Following the prototype I did not think about this aspect but you are 100% right. I belivet it will be more visible with the scenery development. There is grass at the moment - still some places need detailing ...

    IMG_3762.jpg

    IMG_3763.jpg

    IMG_3764.jpg
     
  6. rray

    rray Staff Member

    8,307
    9,425
    133
    I can't believe how fast you work. It takes me a couple weeks just to build a structure, and months to do a module.
     
    gmorider and JMC Scale Models like this.
  7. BNSF FAN

    BNSF FAN TrainBoard Supporter

    10,004
    29,849
    153
    Coming along nicely! I like the stairway up the hillside. Cool!(y)
     
  8. rvn2001

    rvn2001 TrainBoard Member

    398
    405
    23
    I, initially, thought the stairway was track laying on the hillside :oops::confused:
     
    Kurt Moose likes this.
  9. zdrada69

    zdrada69 TrainBoard Member

    1,110
    4,344
    51
    Could be rack railway project startig point :ROFLMAO:

    In meantime I started with the second module of bridge project:


    IMG_3842.jpg
     
  10. zdrada69

    zdrada69 TrainBoard Member

    1,110
    4,344
    51
    I try to model little river as accurate as possible. Here is reference photo - not too good but one can imagine how the bottom of the river should look like:

    IMG_0319.JPG

    That is what I was able to make using Woodland Scenic Water Products and Fine Turf (Soil) :

    IMG_3855.jpg
     
  11. southernnscale

    southernnscale TrainBoard Supporter

    523
    1,176
    29
    Your work looks fantastic! I enjoy seeing your progress and all the details. That bridge price has really gone up with Shapeways new pricing! now they have even add a processing fee now! to the price. Thanks for sharing all your progress!
     
  12. zdrada69

    zdrada69 TrainBoard Member

    1,110
    4,344
    51
    That is true that Shapeways prices are rising ...
    In meantime I finished general construction of second module for the bridge. There is practically only earthwork with plots of lends on both sides. There will be a road crossing the railway at the end.

    IMG_3865.jpg

    IMG_3866.jpg
     
  13. rray

    rray Staff Member

    8,307
    9,425
    133
    OK Jeff, I am going to figure out how to add varying levels of scenery elevation to my TTZ modules. I already have one end module with some elevation.
     
    bostonjim likes this.
  14. zdrada69

    zdrada69 TrainBoard Member

    1,110
    4,344
    51
    I had a break from my main project. I tried to have an effect of the plot of land with the fresh grain which just started to grow.Only one part is ready - for comparison. How do you find it ?

    IMG_3956.jpg

    IMG_3957.jpg
     
    CNE1899, gmorider, HemiAdda2d and 2 others like this.
  15. JoeS

    JoeS TrainBoard Member

    3,209
    1,240
    64
    What impresses me the most is how with the elevation you widened the base not only prototypical bit just looks right to the eye. What is your plan with ground cover on the slope?
     
  16. zdrada69

    zdrada69 TrainBoard Member

    1,110
    4,344
    51
    Slope will be covered mainly with the grass and some small bushes to follow the prototypical landscape:

    IMG_0257.JPG
     
    CNE1899, gmorider, Kurt Moose and 2 others like this.
  17. zdrada69

    zdrada69 TrainBoard Member

    1,110
    4,344
    51
    The slope is covered with the grass. Both modules were put together. There is still a lot to be done...

    IMG_4077.jpg
     
  18. HemiAdda2d

    HemiAdda2d Staff Member TrainBoard Supporter

    22,052
    27,664
    253
    Very nice! Did you abandon the idea of doing a farm field just starting to sprout?
     
  19. zdrada69

    zdrada69 TrainBoard Member

    1,110
    4,344
    51
    It has been a long time since I work with those modules.
    I started with some technical issues like legs. They were made by fellow modeller. Two different types were used due to space available:

    IMG_4883.JPG

    IMG_4884.JPG
     
  20. sidney

    sidney TrainBoard Member

    1,244
    2,112
    38
    neat seeing this come together.
     
    CNE1899 likes this.