Track is layed, wired, and switches coming online....
All the track is down, wired, and feeders soldered. Switches are slowing getting wired up and hooked up at the control panels. There are 3 control panels... the mainline, the yard, and industry. Various buildings are for playing with placement and testing ops. I'm still trying to figure the best way and which scenes I want before I began all the scenery.
-
There are no comments to display.