Brucead

This is the South side of the tunnel. All parts were fabricated, molded & then resin casted. Thats why it has taken me 4 months to get this far.

This is the South side of the tunnel. All parts were fabricated, molded & then resin casted. Thats why it has taken me 4 months to get this far.
Brucead, Dec 30, 2010