rich c

Sand Springs Railway - Yuba Steel Fabrication in West Sand Springs Industrial. Scratch built - The lines on the corrigated metal were made by paint building silver and starting at the bottom and put a piece of masking tape at what ever height you want the panels. Starting right under the tape use a brush with whethering chalk to add a shadow (very light) just under the tape. Move it up, do it again, and again and again.

Sand Springs Railway - Yuba Steel Fabrication in West Sand Springs Industrial.  Scratch built - The lines on the corrigated metal were made by paint building silver and starting at the bottom and put a piece of masking tape at what ever height you want the panels.  Starting right under the tape use a brush with whethering chalk to add a shadow (very light) just under the tape. Move it up, do it again, and again and again.
rich c, May 23, 2009
Kurt Moose likes this.