LALLEY

New Bridge top view

Walthers Shinohara 83 Bridge track, Micro Engineering thru girder and deck bridge (110'), Walthers abutments... Kitbashed (shortened legs and adjusted girder joints to allow for walthers bridge track), painted... The track is painted and weatherd but the bridge still needs weathering and the surrounding terrain needs to be finished with sculptamold and rock casting, etc...

New Bridge top view
LALLEY, Aug 20, 2007
    There are no comments to display.
  • Album:
    New Train Table
    Uploaded By:
    LALLEY
    Date:
    Aug 20, 2007
    View Count:
    754
    Comment Count:
    0