ppuinn

2016-01-17 00.50.28

Sides of the road at Allentown are finished, gravel road to right is painted, abandoned grain elevator mock-up is done...for now. Grade crossing signs added. Still need a stop sign on the gravel road, and grade crossing timbers between the rails.

2016-01-17 00.50.28
ppuinn, Jan 18, 2016
    There are no comments to display.
  • Album:
    Layout Projects
    Uploaded By:
    ppuinn
    Date:
    Jan 18, 2016
    View Count:
    555
    Comment Count:
    0